The Estimator Advantage

We Don't Just Model.
We Protect Your Profits.

Led by a founding team with nearly 20 years of experience BIM and estimating at Vancouver’s leading general contractors.

Pixel BIM helps you identify constructability issues before they happen on site – saving you time and money.

Book an Intro Call
$0B+

In projects supported over career

0+ years

BIM and Estimating Experience

0s

Issues solved in preconstruction

Trusted By Industry Leaders

Orion ConstructionScott ConstructionRam constructionGenmec ACL LogoThe Haebler GroupBLDR - Builder Leader Logo

Why We're Different

We find the issues that would cost you profit.

Most BIM companies hand you a generic report with dozens – or hundreds – of clashes.

We filter, group, and analyze all of the clashes or coordination issues we find to give you an actionable list of items to resolve to make a real difference on your project.

$225k 

Steveston Washrooms
42 identified issues on a single 1,100 sq ft building before construction started.

Chelsea Montgomery

Co-Founder & CEO – Technical Lead

Most BIM managers started in design. I started with general contractors, building BIM departments alongside estimating.

Having spent more than a decade with general contracts, I quickly learned what made a difference for the profit margin on a project.

I founded Pixel BIM to solve a specific problem: General Contractors know they need BIM, but don’t need the overhead and complexity of managing an entirely different technology. We integrate directly with your team providing you the ability to scale your BIM efforts up and down as your projects require.

I have successfully used BIM on a huge range of projects including Legion Veterans Village, Nanak Foods, and UBC Biomedical Sciences building throughout my career where we saw massive successes.

I’d love to help you see those same results on your next project too.

Chad Montgomery

Co-Founder & COO – Business Development

I’ve spent the last seven years as an estimator at some of Vancouver’s top general contractors and subtrades. From glazing and cladding at Flynn Group, where I worked on projects like Telus Ocean’s 100,000 square feet of custom curtain wall, to Scott Construction, where I estimated heritage restorations, BC Housing projects, and institutional builds.

In every one of those roles, I watched the same thing happen: coordination issues that were sitting in the drawings would show up on site as change orders, delays, and difficult conversations. Problems that could have been caught for virtually nothing were costing tens or hundreds of thousands to fix in the field.

That’s why I co-founded Pixel BIM. I know what it’s like to be the estimator looking at a budget that just got blown up by something preventable. I know how PMs talk about coordination, how supers deal with it on the ground, and what trades actually need to build it right.

When you work with us, you’re not getting a consultant who’s read about construction, you’re getting someone who’s lived it from the contractor and subcontractor’s side of the table.

Chad Montgomery Headshot

What This Means For You

When you work with Pixel BIM, you get a technical lead who's implemented BIM departments from scratch — and a business development partner who's lived through the coordination problems your team faces every day. That means deliverables built for how construction actually works, not how it looks in a textbook.

Chelsea delivers the work

10+ years running BIM departments at GCs. Models, clash detection, and reports built by someone who understands how trades actually build.

Chad speaks your language

7 years as an estimator at Vancouver GCs and subtrades. He knows your pain points because he's lived them firsthand.

Proven Results

Nanak Foods Project Rendering

Nanak Foods

Created all 3D models, coordination reports, and clash detection where we identified more than 150 clashes and coordination issues.

Assisted Nanak Foods with layout of their plant and custom equipment to ensure all items fit with the optimal layout.

Steveston Park Washrooms Rendering

Steveston Park Washrooms

Created all 3D models, coordination reports, clash detection, 4D scheduling, and 5D cost esimating for Scott Construction and the City of Richmond.

We identified 42 coordinatoin issues and clashes resulting in a nearly 600% ROI.

BCIT Robert Bosa Carpentry Pavilion

BCIT Robert Bosa Carpentry Pavillion 

Created a comprehensive coordination report flagging 41 coordination and construcability issues on the IFC Drawing set alone.

Issues uncovered included a missing footing, missing light fixtures, and surface mounted vents hanging alone.

Client Feedback

"Pixel BIM has been a truly outstanding partner...If you are looking for someone who is reliable, forward-thinking, and genuinely invested in delivering value, I highly recommend Chelsea without hesitation."

Slava Kulikov Nanak Foods

Ready to Streamline Your Next Project?

See how flexible BIM support can save you time and money.

Book a 30-minute Call