BCIT Robert Bosa Carpentry Pavilion

BCIT Robert Bosa Carpentry Pavilion

Client

The Haebler Group

Location

Burnaby, B.C.

Project Size

37,650 Sq Ft

Services

Coordination Reporting

Project Type

Post Secondary Institution

Building Owner

BCIT

About The Project

Pixel BIM provided coordination support for The Haebler Group on the BCIT Carpentry Pavilion project, where we produced a comprehensive coordination report to identifty coordination and constructability issues on the project during  the preconstruction stage.

The report included 41 high priority issues resulting in a massive return on investment. The indentified issues included things like  a missing footing and column – pictured below.

The coordination reports compare all disciplines against each other to identify discrepancies. Some of the issues we reported included:

  •  Housekeeping pad discrepancies
  •  A column located within curtain wall glazing (pictured below)
  •  No stairs shown in one location on the structural drawings
  •  Missing light fixtures and orientations
  •  Column size discrepancies
Column clashing with glazing on the BCIT Robert Bosa Carpentry Pavilion