BCIT Robert Bosa Carpentry Pavilion
Client
The Haebler Group
Location
Burnaby, B.C.
Project Size
37,650 Sq Ft
Services
Coordination Reporting
Project Type
Post Secondary Institution
Building Owner
BCIT
About The Project
Pixel BIM provided coordination support for The Haebler Group on the BCIT Carpentry Pavilion project, where we produced a comprehensive coordination report to identifty coordination and constructability issues on the project during the preconstruction stage.
The report included 41 high priority issues resulting in a massive return on investment. The indentified issues included things like a missing footing and column – pictured below.
The coordination reports compare all disciplines against each other to identify discrepancies. Some of the issues we reported included:
- Housekeeping pad discrepancies
- A column located within curtain wall glazing (pictured below)
- No stairs shown in one location on the structural drawings
- Missing light fixtures and orientations
- Column size discrepancies